Scope limits: Equipment scope
Restate component mix, panel size, feeder and nozzle counts, three-phase supply, connected load, dry-air pressure, footprint, quantity and destination so factories quote one envelope. Open manufacturer pages that separate CPH under optimum conditions from a real board cycle are used as checklists, not as affiliation. This coordinator does not own a factory, does not stock machines and does not convert a published model sheet into a site-owned rating. Work envelope, tooling and feedstock remain buyer-supplied facts. Throughput in units per hour is not inferred from a headline CPH. Cycle time must include board transfer and inspection. Changeover between two PCB programs is a documented duty.
Price exclusions
Flag extra feeders, tray units, odd-form nozzles, software licenses, spare parts, training, freight, installation and commissioning when they are absent from a reply. Those gaps are comparison items, not hidden discounts. Compressed air demand, PLC interface cabling and SAT travel are also site-cost items. No numerical saving is published without matching scope. Optional budget notes (currency, per-unit or whole-order) and supplier preference (premium, mid-range, budget-friendly, or not sure) are buyer selections, not verified factory ratings.