VERIFIED REQUEST / FIRST ORDER
Compare quotes from up to 3 factories
FREE basic specification and sourcing-requirements review
Eligible first orders may receive up to 3%
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements. Final savings depend on supplier confirmation, product type and order value.
RFQ Checklist
Before specifying pick and place machine price, resolve the board program, feeder and nozzle list, software licenses and the inspection method for the smallest critical component. This page is a decision dossier, not an environmental statement. Smt Pick And Place Machine Sourcing uses the checklist to keep factory quotes comparable. It does not certify plants or guarantee placement output. Project interfaces—power, dry air, conveyors and data—must be named before a headline price is treated as complete.
Decision dossier
Record component mix and panel size, feeder count and special nozzles, requested CPH with board conditions, PCB size in mm, three-phase supply (V, Hz), connected load (kW), dry-air pressure (MPa), footprint, quantity and destination. Attach the centroid revision. Count tape, stick and tray parts; those counts drive feeder occupancy more than a brochure head drawing. Feedstock is the buyer’s components and boards. Tooling is the feeder and nozzle family. Work envelope is the PCB window plus feeder-bank access, not a packaging-robot cell. PLC interface names for printer and reflow handshakes belong here if a line is intended.
Tick whether extra feeders, tray units, odd-form nozzles, software seats, spare parts, training, installation, freight, duties and commissioning are inside or outside the pick and place machine price. A missing tick is an exclusion. Compressed air drops, PLC cabling and SAT travel are also site-cost items. No percentage advantage is stated on this page. Optional budget notes (currency, per-unit or whole-order) help search; they are not a factory rating. Accuracy and inspection method for the smallest critical component should be priced as included vision, extra cameras or a separate AOI, not left unnamed.
A supplier response is usable when it restates the PCB window, feeder and nozzle list, demonstration board, included software, and the FAT sample. Public manufacturer tables that qualify CPH under optimum conditions or that distinguish feeder versus tray arrangements may be cited as questions. They are not this site’s specification. Throughput in units per hour must include handling. Positioning tolerance is judged on the placed sample. Duty cycle is the planned shift pattern, not an implied 24-hour unmanned cell. Supply frequency in Hz must match the US plant.
Remaining inputs: actual production panel if mixed-technology duty is in scope, program-transfer method, spare-parts list, and whether FAT is witnessed. Mark unknowns. Do not invent cooling-water demand that the head does not use.
Selection trade-off: single placement machine versus an integrated SMT line. Interfaces, staffing and acceptance boundaries differ; neither layout is declared universally better here. A second trade-off is nominal CPH versus validated output on the buyer’s board. Both disputes are recorded so procurement and process engineering can choose evidence, not slogans. Working pressure in bar or psi applies only if a pneumatic option is quoted. Footprint must include feeder carts and maintenance aisles. Changeover time between two representative jobs should be written into acceptance if high-mix duty is claimed.
Reference observation dated 2026-09-17 on an open Yamaha YRM20 product page is used only as a unit and attribute checklist (head type, component size mm, CPH under optimum conditions, accuracy mm/Cpk, PCB size mm, air MPa, supply V/Hz). That observation is not a US-localized ranking claim and is not an offer from this service.